Evaluation
Initial review generally takes 1–2 business days when the required information is complete. Special requirements receive separate technical review.
Timing depends on complete information, technical review, materials and production scheduling. The stages below show where each requirement fits before an order is confirmed.
Initial review generally takes 1–2 business days when the required information is complete. Special requirements receive separate technical review.
Regular specifications are generally quoted within 1 business day after technical parameters are confirmed. A suggested validity period is 7–15 days.
Regular custom samples generally take 3–7 business days. Special materials, structures and production runs depend on preparation and scheduling.
Lead time depends on stock status or the confirmed custom specification. Complex or high-volume projects require separate confirmation.
Evaluation and quotation are separate confirmation points. Complex or special requirements may need technical review before price and timing are confirmed.
When the required information is complete, the initial evaluation generally takes 1–2 business days.
Regular specifications are generally quoted within 1 business day after technical parameters are confirmed. Complex custom projects are quoted after technical review.
Use these general periods for planning, then confirm the final schedule against the product, specification, quantity and production arrangement.
MOQ is not one fixed number for every cable. It depends on stock availability for standard products and the production requirements behind a custom specification.
Sample charges and freight are confirmed according to the sample type, courier arrangement and project conditions. Bulk-order freight follows the agreed trade terms.
The process moves from complete information and technical review to quotation, sample confirmation when required, and the confirmed production and delivery arrangement.
Evaluation timing generally begins when the required information is complete. Technical parameters are confirmed as part of the review.
When the required information is complete, the initial evaluation generally takes 1–2 business days. Special structures, materials, certification requirements or complex dynamic operating conditions require a separate technical review.
Regular specifications are generally quoted within 1 business day after technical parameters are confirmed. Complex custom projects are quoted after technical review. A suggested quotation validity period is 7–15 days; significant copper, exchange-rate or raw-material fluctuations may require price re-confirmation.
Regular custom samples generally take 3–7 business days. Special materials, structures, complex shielding or dedicated production runs depend on material preparation and production scheduling.
In-stock standard products are generally arranged for shipment within 1–3 business days. Out-of-stock standard products generally take about 7–15 business days. Custom products generally take about 10–20 business days after specifications and samples are confirmed. Complex structures, large-volume orders, special materials or special testing require separate confirmation.
Please note: timelines are general reference points. The confirmed schedule follows the actual specification, material preparation and production arrangement.
These answers cover the main timing, MOQ, sample fee and shipping questions raised during evaluation and quotation.
When the required information is complete, an initial evaluation generally takes 1–2 business days. Projects involving special structures, materials, certification requirements or complex dynamic operating conditions require a separate technical review.
Regular specifications are generally quoted within 1 business day after technical parameters are confirmed. Complex custom projects are quoted after technical review. A suggested quotation validity period is 7–15 days. Significant copper, exchange-rate or raw-material fluctuations may require price re-confirmation.
Regular custom samples generally take 3–7 business days. Special materials, structures, complex shielding or dedicated production runs depend on material preparation and production scheduling.
In-stock standard products are generally arranged for shipment within 1–3 business days. Out-of-stock standard products generally take about 7–15 business days, subject to specification, quantity and schedule. Custom products generally take about 10–20 business days after specifications and samples are confirmed, subject to separate confirmation for complex structures, large-volume orders, special materials or special testing.
Existing stock specifications can support small-batch purchases, and MOQ depends on the product, specification and stock availability. Some products can be sold by the meter. Custom-product MOQ is determined by product category, conductor cross-section, jacket material, color, construction and production process. Special specifications are evaluated separately based on the minimum production batch.
Stock standard samples may be free depending on the customer and project. Custom samples involving dedicated production, special materials or special processes may incur a sample fee. Whether the fee is deducted from a later agreed-volume order may be discussed. Sample freight is generally borne by the customer, and customer DHL, FedEx, UPS or other courier accounts may be used. If Rolan pays the freight on the customer’s behalf, the cost is confirmed and collected before shipment. Bulk-order freight follows agreed trade terms such as EXW, FOB or CIF.
Send your specification, target requirements, quantity and destination. The technical team can confirm what is needed for evaluation, quotation and sample arrangements.
Include the product, specification and project details that are already available.
SEND YOUR RFQ→